Product description
Requirements
- After the cooling of temperature sensors that result directly from the injection moulding process, their functioning will be verified;
- The verification of 10 temperature sensors simultaneously;
- 4 variants of samples with short modification time;
- Verification temperature of approx. 20°C
- Verification against short-circuits, verification of insulation stability as well as the detection of temperature and resistance;
- The duration of cycle per sample is 8 seconds;
- Classification of errors in 4 categories;
- Remote revision;
- Automated and manual operation;
Solution
- Transfer system for support of components, construction variant with recirculation; tempering interval with 15 min cooling time per sample;
- Adaptor with quick change for the support of components;
- Encrypted contact units with quick change in verification stations;
- Safety equipment with monitoring of protection door and bolt;
- EA Beckhoff system with bus coupler and industrial PC;
- Machine programming with Labview and the simultaneous evaluation of results of measurements and visualization on the screen under the form of tables or diagram;
- Manipulation of NÎO components through pneumatic 2D line portal with NÎO slot and sorting by pneumatic switches with 4 types of errors;
- Sample selection at industrial PC;
- Calibration possibility with master sample in encrypted support of components;