Product description
Requirements
- After the injection casting process, the caps of the frame must be checked if they are tight;
- 3 different sample pieces for short assembling times of the interchangeable devices;
- Checking the under-pressure;
- Leak rate 8 cm³/min
- 25 sec. cadence duration/sample piece;
- »OK« marking of the checked sample pieces;
- Acknowledgement of receipt of the piece that is not OK by the service personnel;
- Automatic and manual operation
Solution
- A control cell with thrust skids and 2 supports for processed pieces;
- 3 supports for the interchangeable processed pieces for all variants of sample piece;
- The sample piece strains with a pneumatic linear unit.
- Three checking programs for all variants of sample pieces;
- 1 piece of JW Fröhlich leak testing device;
- Service with two hands
- Safety device with 2 surveillance channels of the bell protection element;
- Parts that are not OK are removed through a lock only after the manual confirmation;
- »OK« pneumatic marking through color markings;
- Möller compact control;